top of page

2016 Milton Fire Stations Space

Needs Study

The work contained within this section of the website was

completed by the Fire Space Needs Committee (FSNC). 

Table of Contents

1. Executive Summary

2. Headquarters - 515 Canton Avenue

    A. Code Analysis

    B. Existing Conditions Analysis

         1. Landscape

         2. Structural

         3. Architectural

         4. Plumbing

         5. Fire Protection

         6. H.V.A.C

         7. Electrical

    C. Space Needs

    D. Cost Estimate

         1. Opinion of Probable Cost

         2. Construction Cost Estimate

         3. 'Firematic' Equipment Estimate

    E. Option

    F. Hazardous Materials Survey

 

3. East Milton - 525 Adams Street

    A. Code Analysis

    B. Existing Conditions Analysis

         1. Landscape

         2. Structural

         3. Architectural

         4. Plumbing

         5. Fire Protection

         6. H.V.A.C

         7. Electrical

    C. Space Needs

    D. Cost Estimate

         1. Opinion of Probable Cost

         2. Construction Cost Estimate

         3. 'Firematic' Equipment Estimate

    E. Option

    F. Hazardous Materials Survey

4. Atherton Street - 815 Blue Hill Avenue

    A. Code Analysis

    B. Existing Conditions Analysis

         1. Landscape

         2. Structural

         3. Architectural

         4. Plumbing

         5. Fire Protection

         6. H.V.A.C

         7. Electrical

    C. Space Needs

    D. Cost Estimate

         1. Opinion of Probable Cost

         2. Construction Cost Estimate

         3. 'Firematic' Equipment Estimate

    E. Option

    F. Hazardous Materials Survey

bottom of page